Document layer
The full policy pack
The one-page policy is what your crew signs. This is the rest of it — 6 documents in total, each one something you can print today and file tomorrow. No account, no email, no gate.
What is in the pack
| No. | Document | What it is for | When you need it |
|---|---|---|---|
| 1 | One-page AI use policy | The boundary. Signed by staff, reviewed yearly. | Day one. |
| 2 | AI tool ledger | Every tool in the business, what it costs in NZD, and where the data goes. | Whenever someone adds a tool — a new starter, a new app, a subscription that quietly renewed. |
| 3 | DPA checklist | The three questions to put to a vendor in writing, before you pay them. | Before the first payment. Not after the first problem. |
| 4 | Redaction cheat sheet | What to cut out before you paste, and the eight places it is hiding. | Every time. Put it on the monitor beside the keyboard, not in a folder nobody opens. |
| 5 | Breach one-pager | What to do the same day something leaks — and what the Act actually says. | Keep it in the office folder and in the office manager’s phone. Not in the policy document. |
| 6 | Subcontractor AI clause | Paste-ready wording when a subbie is doing work for you with AI in the loop. | Next time you issue a scope, a quote or a subcontract. |
Document 2 of 6
AI tool ledger
Every tool in the business, what it costs in NZD, and where the data goes.
Use it: One owner. Review it at the same meeting as your inductions. · Do not use it: Do not fill it in from the vendor’s website alone — the data region is the column people skip.
What the ledger is for
Your ledger is the answer to “what AI does this office use?”. It is a spreadsheet, not a project. It exists so that when a client asks, an insurer asks, or someone pastes the wrong file on a Tuesday, you can open one tab and see every tool, who pays, who has it and where their data lives.
Ninety per cent of the value is the two columns everybody leaves blank: monthly cost in New Zealand dollars, and the country the data is processed in. Those are the two that decide whether you have a PP12 story.
The columns
| Column | What goes in it | Why you need it |
|---|---|---|
| Tool name | Exact product name as the vendor writes it | Your insurer and your lawyer will search this exact string |
| What it does here | One line — drafting, transcription, estimating, search | Stops three tools doing the job of one |
| Who has it | Names, or “all staff” / “office only” | Tells you who to talk to when it goes wrong |
| Cost NZD / month | GST inclusive, all seats, billed locally if you can | The number you defend in the annual review |
| Data region | The country where prompts, files and storage sit | IPP 12 — if personal information goes overseas, this column is the record |
| Admin control | Yes / No — is there a sign-up you can turn off | Whether you can shut it down today, not next month |
| DPA signed | Date, or “none” | Evidence you did diligence before paying |
| Reviewed | Date of last review | Proves it is live, not a document from 2024 |
Three rules that make it real
- One owner, usually the office manager — not the boss, who will never have the time.
- Bill every paid tool through one admin account. Self-serve sign-ups are the reason the ledger is never complete.
- Review it quarterly at the same slot as your OH&S review. Delete every seat that nobody opened in 90 days.
What a row usually looks like
The pattern to watch for: the free version on a phone, paid by a credit card in someone’s own name, with a data region nobody checked. That row is the one that turns up in a tender disclosure and the one that costs you an afternoon in the office.
NZAI construction pack · document 2 of 6 · [BUSINESS NAME]
Document 3 of 6
DPA checklist
The three questions to put to a vendor in writing, before you pay them.
Use it: Email the questions. Keep the reply. That email is your diligence. · Do not use it: Do not accept a general terms-of-use page as a data sharing agreement. It is not one.
Why this exists in construction
Building firms are not software companies, so the paperwork that protects them is usually borrowed from someone else’s template and never read. The result is a paid AI tool that sees your priced tender, your subbie rates and your client’s personal details, with nothing in writing about where any of it goes.
You do not need a legal team. You need three questions, asked once, in writing, with the answer filed next to the receipt.
The three questions
- Where is my data processed and stored? Ask for the countries, in writing. One line is enough — a sentence is better than a link to a trust page.
- Will you use my content to train a model? If the answer is yes, ask what you can opt out of, and record the date you asked.
- How will you tell me if there is a breach? You want a named notification period and an email address that reaches a human.
Record of the answers
| Date asked | Vendor | Question 1 — data region | Question 2 — training | Question 3 — breach notice | File ref |
|---|---|---|---|---|---|
| [DATE] | [VENDOR] | [COUNTRY — or unknown] | [YES / NO + opt-out] | [PERIOD + contact] | [EMAIL / FILE] |
| [DATE] | [VENDOR] | [COUNTRY — or unknown] | [YES / NO + opt-out] | [PERIOD + contact] | [EMAIL / FILE] |
Red flags that mean stop
- No written answer to any of the three after two weeks — treat that as no.
- A region your team cannot pronounce, with no contractual protection for it.
- Terms that let the vendor change the data handling at any time without notice.
- The free tier offered to staff with no business account available at any price.
Where the Act sits
IPP 12 of the Privacy Act 2020 restricts sending personal information to a foreign party. A written commitment to protect the information to a comparable standard — your contract clauses, not their marketing page — is one of the routes that makes an overseas disclosure lawful. The Privacy Commissioner has published model clauses you can point at.
From 1 May 2026, IPP 3A adds a notice obligation where personal information is collected indirectly. If your AI work infers or scrapes information about people rather than collecting it from them, that principle now applies to you as well.
NZAI construction pack · document 3 of 6 · [BUSINESS NAME]
Document 4 of 6
Redaction cheat sheet
What to cut out before you paste, and the eight places it is hiding.
Use it: Paste the document into a scratch file, redact, then work from the copy. · Do not use it: Do not redact after the fact. Once it has gone into a tool, it has gone.
The eight things that must not go in
- Client, developer or subcontractor names, addresses, phone numbers and emails.
- Live pricing, rate cards, day rates, a completed scope or a priced tender.
- Unredacted drawings, MSJ, RISA, structural sets, survey or geotech data.
- Recordings or transcripts of a variation, claim or dispute discussion.
- Staff and subbie personal information — IRD numbers, bank details, certifications, ticket numbers.
- Anything under NDA, or anything already in dispute.
- Site safety incident details and any person’s health information.
- Your client’s own client — the person one level up who never agreed to anything.
Where those hide in a building office
| File | The thing hiding in it |
|---|---|
| Priced tender or quote | Client name, developer, all subbie rates |
| Email thread | Every person in the chain, plus phone numbers in signatures |
| Site meeting transcript | Variation amounts, claim positions, names |
| Drawing set | Title block with client, engineer and surveyor details |
| Programme or schedule | Consultant names and contact details in the headers |
| RFI or variation request | Contract references, rates, sometimes IRD details |
| Induction or safety records | Names, medical answers, incident notes |
| Subcontractor pack | IRD numbers, bank accounts, certifying bodies |
The routine — eight steps, two minutes
- Open the original file and save a copy with “-work” on the end.
- Work only in the copy.
- Delete the title block, headers and footers.
- Replace names with role codes — “Client”, “Engineer”, “Subbie A”.
- Strip phone numbers, emails and IRD numbers.
- Numbers stay if they are yours and anonymous; change the price if it identifies the client.
- Paste the copy into the tool, never the original.
- Delete the copy when the job closes, or keep it with the job file.
A test that takes ten seconds
Before you paste, ask: if this paragraph ended up on a public model, would I have to ring the client? If the answer might be yes, it is not ready. That single question would have caught most of the shadow-AI cases recorded in the New Zealand building sector’s own research on unmanaged AI use.
NZAI construction pack · document 4 of 6 · [BUSINESS NAME]
Document 5 of 6
Breach one-pager
What to do the same day something leaks — and what the Act actually says.
Use it: Print it. Put it where the site paperwork lives. · Do not use it: Do not delete anything, and do not tell the client it is fine before you know.
First — is this even notifiable?
Under the Privacy Act 2020 you must notify the Privacy Commissioner and any affected person when a privacy breach has caused, or is likely to cause, serious harm. Sections 112 to 117 set the test. Serious harm includes financial fraud, identity theft, physical harm or intimidation, blackmail, employment harm and psychological harm.
A business that collects or holds personal information is an “agency” under the Act, so this is not optional for a building firm. Failing to notify the Commissioner without reasonable excuse is an offence carrying a fine of up to NZD 10,000. The Commissioner also expects notification ideally within 72 hours of becoming aware, even while you are still investigating.
You do not need to be certain. The assessment is whether it is reasonable to believe serious harm has or may occur — judged from the position of a reasonable person in your situation.
The same day — six steps
- Stop the bleeding. Revoke access, rotate the credential, pull the account. Do this before anything else.
- Do not delete anything. Preserve the tool, the prompt history and the file. You will need them to answer questions.
- Write down the facts as they stand: what left, when, whose information, to whom, what you know and what you do not know yet.
- Name one person to run it. Usually the office manager, with the director told the same hour.
- Make the serious harm call. Financial data, identity documents, medical or disciplinary detail, or a variation discussion that exposes a claim position — any of those raises the risk.
- Notify. If the Commissioner and affected people need telling, do it within 72 hours and keep proof you sent it.
Who to call
| Situation | Who |
|---|---|
| Personal safety at immediate risk | Police 111 — before anything else |
| Breach likely to cause serious harm | Privacy Commissioner — Notify Us form, privacy.org.nz |
| Card details, identity documents exposed | Consider CERT NZ and ID Care |
| Online content or extortion | Netsafe |
| Your own insurer or bank | As soon as it is not hypothetical |
| Client or subcontractor affected | Tell them what happened, in writing, once you know |
What the notification needs
- What happened, including when it occurred and when you identified it.
- How many people were affected, if you know.
- The type of personal information involved and how sensitive it is.
- Where the information went, if you know.
- The likely harm and the cultural perspectives on that harm.
- What you have done to contain it, and what security was in place.
- A contact person for the Commissioner to come back to.
Then, the week after
- Add the incident to the ledger’s review slot.
- Fix the control that failed — offboarding, admin accounts, the redaction routine.
- Re-run the readiness score. The dimension that failed is the one you under-scored.
What this page is not
General guidance written for New Zealand building firms, not legal advice. If a breach has happened and the dollar amounts or the people involved are significant, get a lawyer and the Privacy Commissioner’s own guidance at the same time.
NZAI construction pack · document 5 of 6 · [BUSINESS NAME] · reviewed [DATE]
Document 6 of 6
Subcontractor AI clause
Paste-ready wording when a subbie is doing work for you with AI in the loop.
Use it: Paste the clause into the scope letter. Adjust the bracketed bits. · Do not use it: Do not paste it into a consumer chat to "shorten this for us" — the same rule applies.
Why a clause at all
Most subcontracts say nothing about AI, which means nothing about whose data goes where, or who checks the output. When a subbie drafts a variation letter with a tool and sends it to your client in your name, the gap is yours to explain.
Three sentences closes most of it. Add them to the scope or the letter of appointment rather than rewriting the whole contract.
The clause
| Clause | Wording |
|---|---|
| Tool use | The Subcontractor must not enter into any AI or machine learning tool any personal information, confidential information, or unredacted drawings, programmes or pricing of the Principal or the Principal’s client. |
| Checking | Where the Subcontractor uses an AI tool to prepare anything issued to the Principal or to any client — including a quote, scope, programme, variation, RFI or record — a named person must check the output before it is issued. |
| Records | The Subcontractor keeps the prompt history, the file version and the date of issue for every item prepared with an AI tool, for the life of the contract and two years afterwards. |
What it buys you
- A named person somewhere in the chain who checked the number before it left.
- A record that exists if a variation later becomes a claim.
- A written answer to the client’s question about where the information went.
If a subbie pushes back
The usual answer is “we already do this”. The clause is not asking them to stop — it is asking them to say which tool, who checks, and where the file is kept. Most established subcontractors will agree in a minute, because they would rather say so in writing than have it discovered later.
NZAI construction pack · document 6 of 6 · [BUSINESS NAME]
Saving prints every document in the pack in order. Choose “Save as PDF”, A4, and include the header and footer if you want the page references on it.